
Facility assessment and reality capture for Bartlett ISD — drone photogrammetry, NavVis VLX interior LiDAR, orthophoto DOM, and School Evaluation Questionnaire in one coordinated September 2025 campaign. A scan alone or photos alone don't support renovation planning; Bartlett ISD needed the complete picture.
Orthophoto DOM, two E57 interior point clouds, and structured facility assessment — complete as-built record for renovation planning.
E57 scan — NavVis VLX · Loading…
Kevin Flores

Plano East SHS is a $51M additions and renovations project — 43,250 SF of new construction including two practice gyms, locker rooms, and site structures, plus heavy renovation of Units C and D and CTE classroom conversion in Unit B3. The campus Panthers mascot sculpture needed to appear in project renderings, but no 3D model existed. Close-range photogrammetry was the solution: 464 photos captured with a Sony A7V, processed in RealityCapture into a sub-15K polygon mesh that dropped directly into the Enscape workflow.
Existing sculpture in the renders — no manual modeling required.
Drag to orbit · Scroll to zoom · Double-tap to reset
Alberto Alvarez · Ali Al Samawetli · Anannya Das · Barrett Bertrand · Ben Hall · Benjamin Snyder · Brandon Monroe · Claire Bueter · Corinne Tendorf · Costas Alexandris · Diego Barrera · Fabiane Rocha Bello Soares · Freddy Jove · Ismail Ghafur · Jameela Rupawala · Jason Oswald · Jennifer Spring · Jerred Denney · Juan Lua · Karla Solis · Kelly Trompler · Kerrigan Servati · Kevin Flores · Leigh Ann Castillon · Lindsey Freund · Luis Guzman · Mary Cole Daulton · Mia Robison · Michael Eckstein · Rebs Beers · Sahil Patel · Shayani Gujarathi · Shreya Vadrevu · Tama Higuchi · Xi Ling