Lakeview Centennial High School — exterior NW view showing full building facade
← Work Education · K-12

Garland ISD Lakeview Centennial High School

Garland Independent School DistrictGarland, TXNov 2023 – Dec 2024
6+Consultants Linked
5Phase Milestones
3Drone Sessions
June 2024SD Board Presentation

Overview

38,700 SF addition to Lakeview Centennial High School for Garland ISD —a two-story classroom wing with 20 classrooms, collaboration spaces, and a relocated administration area, doubling as the campus storm shelter. Accompanied by auditorium, cafeteria, locker room, and dance suite renovations. SD presented to the Board in June 2024; project is in active construction. I contributed in two capacities: design staff from pre-design through DD, and reality capture lead for existing conditions documentation.

My Role

  • Design staff from pre-design through DD —programmed the addition and storm shelter option; produced overall floor plans, reflected ceiling plans, exterior elevations, interior elevations, and casework drawings
  • Conducted exterior drone photogrammetry —multi-session documentation of the site and building envelope for existing conditions reference
  • Conducted interior LiDAR scanning of key design areas —NavVis VLX used to capture existing conditions geometry for scan-to-BIM integration
  • Processed point cloud data and built existing conditions Revit model from scan data —provided the production team accurate as-built geometry for the renovation and addition work
  • Supported SD Board Presentation visualization (June 2024) —model geometry and Datasmith export for Twinmotion rendering
  • Documented construction progress via drone photography through CA phase (November 2025 – January 2026)
Outcome

Design drawings from pre-design through DD. Existing conditions in Revit from scanned geometry. Construction progress documented November 2025 and January 2026.

Project Team

Alfredo Posada · Arturo Viera · Audra Hoefelmeyer · Aymara Padilla · Barrett Bertrand · Benjamin Snyder · Christi Morgan · Christian Martinez · Derrick York · Diego Barrera · Giovanni Velazquez · Griff Servati · Hazel Nansubuga · Ismail Ghafur · Ivanna Gastelum · James Berndt · Jason Byerly · Jason Oswald · Jennifer Spring · Kevin Flores · Leah Leonard · Leigh Ann Castillon · Lindsey Freund · Madalyn Montreuil · Mary Davis · Michael Eckstein · Niveda Subramanian · Oscar Lazalde · Rebs Beers · Ruben Medrano · Sahil Patel · Sara Arnett · Sarah Gentry · Shikhar Kapur · Sierra Honesto · Suraj Notta · Thomas Mejia · Yesha Goti

Client

Garland Independent School District

Location

Garland, TX

Role

Design Staff & Reality Capture

Status

Handed off at 50% CDs — December 2024

Firm

WRA Architects

Tools

  • Revit 2025
  • NavVis VLX (interior scanning)
  • ReCap Pro
  • DJI Drone (exterior photogrammetry)
  • Twinmotion
  • Enscape